Expansion of the LNG terminal
Project Design Basis
A project focused on expanding the customer’s gas storage capacity and optimizing the transfer of gas from vessels to onshore storage tanks.
- ESD SKID for loading arm,
- modification of existing jetty (connection for unloading LNG from ship),
- pipelines modification DN20 up to DN200,
- nitrogen system,
- modification of V=700m3 tanks,
- replacement of DN200 remote controlled valves.