Project Design Basis

Ensuring gas supply security for local companies and optimizing logistics processes.

  • Cryogenic pump skid with a submerged pump unit,
  • MID-approved LNG mass flow meter,
  • Nitrogen supply system,
  • Compressor with air dryer,
  • Instrument air panel,
  • Valve and instrumentation connections,
  • Pressure Build-Up Unit (PBU) with interconnecting piping,
  • Internal piping,
  • PLC control cabinet and instrumentation cabinet,
  • Service stairs and access platforms,
  • LIN boil-off gas management system designed to reduce pressure in LNG storage tanks,
  • ESD (Emergency Shutdown) interface.