Intermediate storage LNG terminal
Project Design Basis
Ensuring gas supply security for local companies and optimizing logistics processes.
- Cryogenic pump skid with a submerged pump unit,
- MID-approved LNG mass flow meter,
- Nitrogen supply system,
- Compressor with air dryer,
- Instrument air panel,
- Valve and instrumentation connections,
- Pressure Build-Up Unit (PBU) with interconnecting piping,
- Internal piping,
- PLC control cabinet and instrumentation cabinet,
- Service stairs and access platforms,
- LIN boil-off gas management system designed to reduce pressure in LNG storage tanks,
- ESD (Emergency Shutdown) interface.