LNG regasification unit
Project Design Basis
A transition to a significantly more environmentally friendly and efficient energy supply solution at our customer’s manufacturing facility. The implementation of an LNG installation provides a compact energy storage solution while reducing logistics and operating costs.
The scope of the installation included:
- Vertical LNG storage tank, V = 180 m³,
- Ambient vaporizers,
- Electric gas preheater,
- Odorization unit,
- Redundant pressure reduction station,
- Piping, valves, and instrumentation,
- Pressure build-up units,
- Turbine gas meter with volume corrector,
- PLC and instrumentation cabinet,
- ESD link.
Contact:
Marcin Behnke
tel.: +48 32 39 33 125
tel.: +48 32 39 33 203
fax: +48 32 39 33 301
email: krio@chemet.com.pl




