Project Design Basis

A transition to a significantly more environmentally friendly and efficient energy supply solution at our customer’s manufacturing facility. The implementation of an LNG installation provides a compact energy storage solution while reducing logistics and operating costs.

The scope of the installation included:

  • Vertical LNG storage tank, V = 180 m³,
  • Ambient vaporizers,
  • Electric gas preheater,
  • Odorization unit,
  • Redundant pressure reduction station,
  • Piping, valves, and instrumentation,
  • Pressure build-up units,
  • Turbine gas meter with volume corrector,
  • PLC and instrumentation cabinet,
  • ESD link.

Contact:

Marcin Behnke

tel.: +48 32 39 33 125
tel.: +48 32 39 33 203
fax: +48 32 39 33 301
email: krio@chemet.com.pl